Let's Talk
+44 (0) 121 511 0400
ipu@ipu.co.uk
IPU Group
Log in
Quote
ContactsContact us
  • Home Page
  • Explore IPU
  • Tank Cleaning
  • Your Industry
    • Marine Industry
    • Oil & Gas Industry
    • Mining
    • Healthcare
    • Data Centres & IT Services
    • Power Generation
  • IPU Academy
  • Fuel Management Services
    • Case Studies
    • HMRC Red Diesel Rebate Changes
    • IPU Fuel Conditioning Programmes
    • Diesel Testing – DieselCheck Service & Kits
    • Fuel Cleaning Services – ClearTank diesel cleaning
    • Fuel Tank Cleaning
    • Fuel Polishing Systems – Diesel Defence
    • Diesel Defence Servicing
    • Cloud Based Fuel Monitoring
    • Fuel Polishing Hire
    • Diesel Defender Fuel Additive
    • Baldwin Filters
    • Parker Racor Filtration
    • Donaldson Filters
    • Supporting Fuel Conditioning Products
    • What is Diesel Contamination?
    • Fuel Conditioning Contacts
  • Environmental Services
    • OFTEC Inspection services
    • MCERTS Emissions Gas Testing
    • Total Fuel Management
  • Case Studies
  • Servicing
  • Emissions Reductions
    • Case Studies
    • IPU Emissions Solutions
    • Selective Catalytic Reduction system (SCR)
    • Diesel Particulate Filter for gensets (DPF)
    • Latest Emissions Legislation: MCPD and NRMM
    • Clean Air Zones
    • Stack Modelling
    • What is NOx?
    • What is Particulate Matter?
  • CAN Bus Solutions
    • Senquip Telemetry ORBs
    • Enovation Engine and Genset Battery Chargers
    • Enovation J1939 Input/Output Modules
    • Enovation CAN J1939 PowerView Gauges
    • Enovation Process Monitoring Instruments
  • Displays
  • Filtration
    • Parker Racor Filtration
    • Baldwin Filters
    • Donaldson Filters
  • Component Sourcing
    • Single Sourcing
    • Specialist Component Sourcing
    • Engine Manufacture
    • Oil Industry Supply Company
    • Marine Engine Service Company
  • Manufacturing Services
    • IPU Sub-Assemblies
  • Case Studies
  • About IPU
    • About Us
    • Our capabilities
    • Our Distributors
    • IPU’s COVID-19 Response
    • Meet the Management Team
    • IPU Finance Options
    • Contact Us
    • Our History
    • Quality & Environmental
    • Modern Slavery Policy
    • Careers
    • News
    • Compliments & Complaints
  • Contact Us
  • Downloads
  • News
  • All Products

Home » Ofgem Electricity Capacity Assessment 2014

Ofgem Electricity Capacity Assessment 2014

The Electricity Capacity Assessment is Ofgem’s annual report to the Secretary of State assessing the risks to electricity security of supply in Great Britain for the next five winters. Ofgem’s assessment is based on data from National Grid accompanied by its own analysis.

It suggests that, without the new measures introduced, the risks to the security of our electricity supply over the next five winters would be broadly consistent with those in last year’s report. Margins are expected to fall over the next two winters as older power stations close, before improving in the later years of the analysis.

The critical factor for IPU and its customers is the projected level of ‘spinning reserve’ (referred to as “capacity margin” in the report). This is defined as the excess of installed generation over demand. When the reserve falls there is a chance of brownouts or blackouts at peak times. While this is merely an inconvenience to domestic users it can be critical to datacentres, hospitals, call centres, banks, government departments, etc.

The broader picture is that the UK’s generating capacity has declined because older, ‘dirty’ power stations have been closed down before cleaner or renewable power sources come online. While the capacity margins are tight schemes like STOR (Short Term Operating Reserve) use diesel generators to provide backup power to the grid under the control of relays such as ComAp’s MainsPro and InteliPro.

Ofgem’s analysis takes availability factors into account when arriving at its projections for the UK’s capacity margin. Notable sections of the report include:

 

“As in our Electricity Capacity Assessment 2013, we expect a reduction in generation margins over the next two winters, with de-rated margins dropping to their lowest level in 2015/16 as a result of a reduction in supplies from conventional generation. There has been a sharp reduction in demand since last year, which National Grid believes comes from energy efficiency measures, an increase in generation connected to distribution networks, and demand reduction by the industrial and commercial sectors at times of peak demand. But this has been offset by a greater reduction in available electricity supply than previously expected.”

 

“National Grid’s scenarios show that the de-rated margins will drop until 2015/16, reaching a minimum of around 3%, and then recover.”

 

“Our sensitivity analysis shows that the de-rated margins could vary between around 2% and 8% in 2015/16. They could drop to around 2% if, for example, demand was higher than projected by National Grid. Fewer imports from mainland Europe and further plant closures or mothballs could also lead to the same outcome.”

 

“Under National Grid’s scenarios, loss of load expectation (LOLE) increases from less than 1 hour per year in 2014/15 to a maximum of around 3 to 5 hours per year in 2015/16. Our analysis shows a larger range of risks, from as much as 9 hours per year for a higher demand or lower supply, down to close to zero if, for example, there were full imports from mainland Europe.”

 

Further information is available from Ofgem.

 

Downloads(no ID req'd)

  • Ofgem Electricity Capacity Assessment 2014
  • This field is for validation purposes and should be left unchanged.
IPU Group

Registered in England & Wales: 12167631

WASP Industrial Power Units Ltd
Navigation Way
West Bromwich
West Midlands
B70 9DF, UK

Contact us
+44 (0) 121 511 0400
+44 (0) 121 511 0401
ipu@ipu.co.uk
Links
  • Homepage
  • Product Registration
  • Product Manuals
  • Terms & Conditions of Sales
  • Privacy & Cookies

ENGINE STARTING DIVISION ACQUIRED

Industrial Power Units Ltd. of the United Kingdom (IPU Group Ltd) has concluded an acquisition to sell its Engine Starting Division to an international group of companies. This sale concluded in September 2024.

Following the sale, the Engine Starting division of IPU Ltd is now Powerstart Limited, and will be managed by David Caddick (previous Sales and Technical Director of IPU).

The full range of engine starting products, including starter motors and bespoke systems, are now available through Powerstart Limited.

IPU will continue to provide an ever-expanding range of fuel polishers & maintenance products and emissions gas testing, and remain premier distributors for several global brands.

Please select whether to be redirected to our new partner site Powerstart Limited or stay on the IPU website.

Go to Powerstart Stay on IPU