Visit our online store Dismiss

Let's Talk
+44 (0) 121 511 0400
ipu@ipu.co.uk
IPU Group
Log in
StoreQuote
ContactsContact us
  • Home Page
  • Webshop
  • Explore IPU
  • Your Industry
    • Marine Industry
    • Oil & Gas Industry
    • Mining
    • Healthcare
    • Data Centres & IT Services
    • Power Generation
  • IPU Academy
  • Fuel Management Services
    • Case Studies
    • HMRC Red Diesel Rebate Changes
    • IPU Fuel Conditioning Programmes
    • Diesel Testing – DieselCheck Service & Kits
    • Fuel Cleaning Services – ClearTank diesel cleaning
    • Fuel Tank Cleaning
    • Fuel Polishing Systems – Diesel Defence
    • Diesel Defence Servicing
    • Cloud Based Fuel Monitoring
    • Fuel Polishing Hire
    • Diesel Defender Fuel Additive
    • Baldwin Filters
    • Parker Racor Filtration
    • Donaldson Filters
    • Supporting Fuel Conditioning Products
    • What is Diesel Contamination?
    • Fuel Conditioning Contacts
  • Environmental Services
    • OFTEC Inspection services
    • MCERTS Emissions Gas Testing
    • Total Fuel Management
  • Engine Starting
    • Case Studies
    • Hydraulic Engine Starting
    • Spring Starters – SureStart
    • Air Starters
    • Nitrogen Starting Systems
    • Reman Air Starter Motors
    • ATEX Starting
    • Inertia Starter Motors
    • Pre-engaged Starters
    • Servicing
    • Engine Starting Contacts
  • Emissions Reductions
    • Case Studies
    • IPU Emissions Solutions
    • Selective Catalytic Reduction system (SCR)
    • Diesel Particulate Filter for gensets (DPF)
    • Latest Emissions Legislation: MCPD and NRMM
    • Clean Air Zones
    • Stack Modelling
    • What is NOx?
    • What is Particulate Matter?
  • CAN Bus Solutions
    • Senquip Telemetry ORBs
    • Enovation Engine and Genset Battery Chargers
    • Enovation J1939 Input/Output Modules
    • Enovation CAN J1939 PowerView Gauges
    • Enovation Process Monitoring Instruments
  • Displays
    • Displays
  • Filtration
    • Parker Racor Filtration
    • Baldwin Filters
    • Donaldson Filters
  • Component Sourcing
    • Single Sourcing
    • Specialist Component Sourcing
    • Engine Manufacture
    • Oil Industry Supply Company
    • Marine Engine Service Company
  • Manufacturing Services
    • IPU Sub-Assemblies
  • Case Studies
  • About IPU
    • About Us
    • Our capabilities
    • Our Distributors
    • IPU’s COVID-19 Response
    • Meet the Management Team
    • IPU Finance Options
    • Contact Us
    • Our History
    • Quality & Environmental
    • Modern Slavery Policy
    • Careers
    • News
    • Compliments & Complaints
  • Contact Us
  • Downloads
  • News

Home » Case Studies » Engine Starting » Engine Starting - Air » Pearl Air Starting GTL

Pearl Air Starting GTL

Application: GTL Plant
Location: Qatar
Engine: 6 off Caterpillar 3616

Air Start Package

IPU have supplied six complete air start systems for the Pearl GTL project in Qatar. The plant, a joint development by Qatar Petroleum and Shell, will process about three billion barrels-of-oil-equivalent over its lifetime from the world’s largest single non-associated gas field, which stretches from Qatar’s coast out into the Gulf.

The field contains more than 900 trillion cubic feet of gas, about 15% of worldwide gas resources and will produce enough fuel to fill over 160,000 cars a day.

The compressed air system was designed for primary starting of the CAT 3616 engines; driving generators which will supply the main power for Gas to Liquids plant during the construction phase, and which will later supply standby power for the site. The starting system was to be situated in Ras Laffan, Qatar and therefore had to be equipped to deal with temperatures up to +50ºC with high humidity.

The complete system comprised two stainless steel 1900 litre ASME VIII Div. 1 and ‘U’ stamped air receivers, storing air at 30 bar. The design featured a duty electric compressor and diesel driven standby compressor. All pipe work, valves and fittings were in stainless steel and all instrumentation and electric components were made to meet Zone 2 requirements.

IPU Starting systems can be designed to comply with Shell’s demanding DEP (Design and Engineering Practices) specifications in mind.

For more information contact a member of our Starting Sales Team on +44 (0) 121 511 0400

« Previous Case Study
Next Case Study »
« Back to all News

Downloads(no ID req'd)

  • IPU Case Study – Pearl GTL
  • This field is for validation purposes and should be left unchanged.
IPU Group

Registered in England & Wales: 12167631

Industrial Power Units Ltd
Cygnus Way
West Bromwich
West Midlands
B70 0XB, UK

Contact us
+44 (0) 121 511 0400
+44 (0) 121 511 0401
ipu@ipu.co.uk
Links
  • Product Registration
  • Product Manuals
  • Terms & Conditions of Sales
  • Privacy & Cookies