Extending oil life for Energyst

Markets: Case Studies for the Power Generation market

Challenges faced

  1. Energyst needed to reduce maintenance costs and simplify service procedures. Reducing oil changes was identified as a primary goal.
  2. Reliability and uptime had to be maintained because the gensets provide primary power to Gibraltar.
  3. Any solution had to fit within the tight space constraints of the Gibraltar site.

Solutions Delivered

  1. OilLife units successfully allowed engines to run safely to 2,000 hours without changing oil, extending service intervals by a factor of four.
  2. OilAlert sensors gave Energyst 24/7 access to real-time oil condition data.